Прыжки с парашютом
SWS Fire2SWS Edge2SkyWideSystems
На главнуюКарта сайтаНапишите нам

Fire actual production terms are
16-18
weeks

SWS Demo-tours 2020





Authorized as a member of
Parachute Industry Association

Block structure

 

At the designing stage we deliberately have chosen the block structure, where a container consists of not only one detail but of a several details assembled together.

Of course, this structure has its disadvantages: labor intensiveness and high production cost, huge material consumption, slightly bigger weight.

But also it has a great advantage which is as follows: a flap damaged at shitty landing may be easily replaced – you can order a flap of a specified color to be sewed by a qualified rigger right on place with a simple set of professional equipment.





BackTop
© 2007-2022 SkyWideSystemsSWS | Sitemap | Search | 1Vzlet.com | DZ Skydive Academy